Wednesday, May 27, 2009

Closet to Bathroom in York

The job was to make a bathroom out of a closet!

We started by knocking out two walls of the closet and the plaster & lathe side walls. Then frame up the new enlarged room, with a 45 degree corner to open up the passage in the kitchen.

After framing, both drain lines and water supply lines were run for the sink and toilet.

Electric was run for a vent fan/light and for a GFCI outlet, on a dedicated circuit to the main panel.



Then we sheetrocked inside, outside and ceiling. A pocket door was framed in to conserve space.


Densheild floor backer was laid for the tile floor.

On this job, the homeowner wanted to do her own spackle, paint, and tile work.



We came back a week later and installed the toilet,
sink, and trim.


She was very happy to
finally have a bathroom
downstairs!

3 comments:


  1. Thank you. I just wanted to know where to ship it since I know now to keep producing it.

    Home Renovation Services

    ReplyDelete
  2. WOW! your post is very good with effective information and amazing images Thanks for sharing. Handyman Service in Alpharetta
    Handyman Service in Newnan

    ReplyDelete

  3. Water may be a big topic in CALGreen, and it covers everything from construction runoff, indoor and outdoor water usage, indoor moisture, and humidity. As a part of the mandatory measures, CALGreen mandates a 20% reduction of indoor water use for both residential and non-residential projects.
    general contractors Mobile AL

    ReplyDelete